I do love this phone though.
Quilt update: Mom's quilt is slow going. The star blocks are time consuming with each taking about 45 minutes each. Im thinking I will stop at 16 and assemble the center of the quilt. Im thinking that can be completed before St. Johns in 26 days. I think it would be optimistic. To the point of foolishes to expect more than that given the OT I want to pull this coming month.
Published with Blogger-droid v1.6.3
No comments:
Post a Comment